项目名称
枫泽星都汇
Project name
Maple Star Confluence
阶段
水电开槽
Process
Furniture approach
项目名称
枫泽星都汇
Project name
Maple Star Confluence
阶段
水电开槽
Process
Furniture approach
项目名称
复地东湖国际6期
Project name
Forte East Lake International Phase 6
阶段
新砌墙挂网,植入钢筋 封阳台前的保护措施
Process
New wall hanging net, implanted steel Protective measures before closing the balcony
项目名称
领秀城
Project name
Ling Xiucheng
阶段
轻钢龙骨吊顶 陶粒回填
Process
Light steel keel ceiling ceramic backfill
项目名称
复地东湖国际2期
Project name
Forte East Lake International Phase 2
阶段
新砌墙挂网 贴砖
Stage
New Brick Wall Netting Tiles
项目名称
星都会
Project name
Star Metropolis
阶段
水电预验收
Stage
New Brick Wall Netting Tiles
工艺说明
强弱电管平行间距不小于300mm,强电与弱点交叉点用锡纸保护
Process Description
The parallel distance between strong and weak electricity pipes is not less than 300mm. The intersection of strong electricity and weak points is protected with tin foil.
项目名称
中建南湖壹号
Project name
Zhongjian South Lake nickname
阶段
贴砖,水路标识,阳角条保护
Stage
Tiles, waterway signs, sun protection
工艺说明
阳角瓷砖碰45度贴,地铺砖用对应规格的十字卡,保证水平缝隙一致 地漏瓷砖做回字形
Yangjiao tile touch 45 degree paste, the cross-card with the corresponding specifications for the floor tile, ensure the horizontal gap is consistent
项目名称
融科花满庭
Project name
Rong Ke Hua Manting
项目面积
110平
Area
110 square meters
项目阶段
轻钢龙骨吊顶
Process
Light steel keel ceiling
项目名称
长江国际
Project name
Changjiang International
阶段
长江国际完工前检查插座开关面板
Stage
Check socket switch panel before completion
项目名称
鑫鑫花园
Project name
Xinxin Garden
阶段
完工前检查插座开关面板
Stage
Check socket switch panel before completion
项目名称
融科花满庭
Project name
Rong Ke Hua Manting
项目面积
110平
Area
110 square meters
项目阶段
陶粒回填 铺设钢网
Process
Ceramic backfill laying stencil
项目名称
复地东湖国际2期
Project Name
Forte East Lake International Phase 2
项目阶段
水电阶段
Project Phase
Hydropower stage工艺说明:每根线管之间间距是5mm,线管并行间距800mm用水平排卡固定;
The spacing between each line tube is 5mm, and the line tube parallel spacing 800mm is fixed with a horizontal row card;
项目名称
锦华华庭
Project name
Jinhua Huating
阶段
开工仪式
Process
Groundbreaking ceremony
项目名称
美联城
Project name
American Union City阶段
开工仪式
Process
Groundbreaking ceremony
项目名称
融科花满庭
Project name
Rong Ke Hua Manting
项目面积
110平
Area
110 square meters
项目阶段
淋浴区墙面防水
Process
Shower area wall waterproofing
项目名称
复地东湖国际6期
Project name
Forte East Lake International Phase 6
项目阶段
水电预验收
Process
Hydropower pre-acceptance项目说明:强弱电管平行间距不小于300mm,强电与弱点交叉处要用锡纸保护;
Project Description: The parallel distance between strong and weak electricity pipes shall not be less than 300mm, and the intersection of strong electricity and weak points shall be protected with tin foil;
项目名称
星都会
Project name
Star Metropolis
项目阶段
材料验收;泥工施工
Process
Material acceptance; Mason construction项目说明:优时吉博罗石膏板,无甲醛,无磷石膏风险,纳米技术高强抗裂;德国进口欧松板;无醛环保稳定性强;用对应规格的十字卡,保证水平缝隙一致;
Excellent giboro gypsum board, no formaldehyde, no risk of phosphorus gypsum, nanotechnology high-strength crack resistance; Germany imported Ou Song board; aldehyde-free environmental stability and strong; with the corresponding specifications of the cross card, to ensure that the horizontal gap is consistent;
项目名称
复地东湖国际6期
Project Name
Forte East Lake International Phase
项目阶段
水电验收
Project Phase
Hydropower stage工艺说明:每根线管之间间距是5mm,线管并行间距800mm用水平排卡固定;
The spacing between each line tube is 5mm, and the line tube parallel spacing 800mm is fixed with a horizontal row card;